U.S. Army Corps of Engineers Logo
Position Title
Lead Construction Control Representative
Agency
U.S. Army Corps of Engineers
Announcement Number
CERH245343672047 Opens in new window
Open Period
Tuesday, November 26, 2024 to Monday, December 9, 2024
For preview purposes only. To apply, please return to the USAJOBS announcement and click the Apply button.
Eligibilities
1. Do you claim Veterans’ Preference? (limit characters)
2. Interagency Career Transition Assistance Plan

Are you a current or former federal employee displaced from a position in a federal agency other than the agency hiring for this position?  If yes, confirm:

• you are located in the same local commuting area of the vacancy

• your grade is equivalent to or below the grade level of the vacancy and

• your last performance rating of record is at least fully successful or the equivalent.

ICTAP applicants must be well qualified for the position to receive consideration for special priority selection. Well-qualified is defined as meeting all of the minimum qualification standards and eligibility requirements as well as possessing skills that clearly exceed the minimum qualification requirements for the position.

*Note: Under competitive delegated examining, an ICTAP eligible will be considered well-qualified if they attain an eligibility rating of 90 or higher, not including points for veterans' preference.

Supporting documentation: Federal employees seeking ICTAP eligibility must submit proof that they meet the requirements of 5 CFR 330.704, by submitting a copy of the following documents with your completed application: A copy of your agency notice; AND,

A copy of your most recent annual performance appraisal; AND,

A copy of your most recent SF-50 noting current position, grade level, and duty location.  Additional information regarding ICTAP eligibility can be found in the OPM Employee's Guide to Career Transition.  For more information, review the USAJOBS Resource Center.
(limit characters)
3. Military Spouses, under Executive Order (E.O.) 13473

You are eligible for this hiring category if you:

• Are a spouse of a member of the Armed Forces serving on active duty for more than 180 days other than for training; OR

• Are a spouse of a 100 percent disabled service member injured while on active duty; OR

• Are the un-remarried widow or widower of a service member who was killed while performing active duty.

Supporting documentation: You are required to submit acceptable documentation of your eligibility for E.O. 13473 which may include:

• verification of the marriage to the service member (i.e., a marriage license or other legal documentation verifying marriage);

• verification of the member's 100 percent disability; and/or

• verification of the member's death while on active duty.

Additionally, you may need to submit a Standard Form-15 (SF-15), an Application for 10-Point Veterans' Preference, and applicable supporting documents as noted on the form.

To obtain a copy of SF-15, go to http://www.opm.gov/forms/pdf_fill/SF15.pdf.

Are you eligible to apply as a Military Spouse under Executive Order 13473?
(limit characters)
4. Priority Placement Program, DoD Military Spouse Preference (MSP) Eligible
 
I am a military spouse who is currently married to my active duty sponsor. I am exercising my preference eligibility for positions within the local commuting area of my sponsor's current duty station.  I certify that I have not accepted nor declined a permanent, continuing Federal or non-appropriated fund position in the local commuting area of our current duty location. 

NOTE:  Military spouses are eligible for one permanent noncompetitive appointment using their preference eligibility for the duration of the active duty sponsor's assignment to a permanent duty station, as long as the military spouse has not declined or accepted a permanent Federal or non-appropriated fund position in the commuting area of the sponsor's current duty location.  If you certify that you have not used your preference at your sponsor's current duty location and it is discovered to be untrue, you may be subject to loss of MSP and possible disciplinary action. 

Supporting Documentation:  You must include a copy of the Military Spouse PPP Self-Certification Checklist along with the documents identified on the checklist to verify your eligibility for MSP, such as PCS orders/verification of duty location assignment and a copy of marriage certificate or license.

Are you a Priority Placement Program DoD Military Spouse Preference Eligible?
(limit characters)
5. Reinstatement

You are eligible for this hiring category if you:
  • Are a former Federal employee who previously attained career status (identified as Tenure I (block 24) and Competitive Service (block 34) of your last SF-50, Notification of Personnel Action); OR
  • Are a former Federal employee with veterans' preference who previously attained career-conditional status (identified as Tenure II (block 24) and Competitive Service (block 34) of your last SF-50, Notification of Personnel Action); OR
  • Are a former Federal career-conditional employee (identified as Tenure II (block 24) and Competitive Service (block 34) of your last SF-50, Notification of Personnel Action) without veterans' preference who separated from Government service within the past three years.
This eligibility also covers current permanent Federal employees when the area of consideration ("Who May Apply") does not include an option to apply as a current Federal employee. To verify your eligibility, you are required to submit a copy of your most recent Notification of Personnel Action, SF-50 indicating Tenure I or II (block 24) and Competitive Service (block 34) with your completed application.

Supporting documentation: You are required to submit a copy of your separation Notification of Personnel Action, SF-50 with your completed application.

Are you eligible for Reinstatement?
(limit characters)
Preferences
1. Would you accept a temporary appointment? (limit characters)
Conditions of Employment
This position has requirements which must be met prior to employment, and conditions for continued employment. Your answers to the questions in this section will indicate your understanding of, or possession of, these requirements and conditions. (limit characters)
1. The duties of this position require the incumbent to possess or obtain and maintain a valid state Driver's License in one of the 50 U.S. states or possessions to operate vehicles. Do you currently possess or are you willing and able to obtain and maintain a valid license to comply with the requirement? (limit characters)
2. This is a Temporary position intended to last 12 months. A temporary position may be extended to a maximum of three years and may be terminated at any time during the duration of the appointment, depending upon the needs of management. Are you available for temporary employment? (limit characters)
3. Appointment to this position is subject to a one year probationary period unless the appointee has previously met the requirements as described in 5 CFR Part 315. While probationary the incumbent can be terminated with limited appeal rights. Are you willing to serve a one year probationary period? (limit characters)
4. This position has a Temporary Duty (TDY) or business travel requirement of 25% of the time. Are you willing and able to travel away from your permanent duty station up to 25% of the time? (limit characters)
Assessment 1
Thank you for your interest in this Lead Construction Control Representative, GS-0809-13 position with Department of the Army. Your resume and the responses you provide to this assessment questionnaire will be used to determine if you are among the best qualified for this position. Your responses are subject to verification. Please review your responses for accuracy before you submit your application. (limit characters)
1. Select the one statement that best describes the education and/or experience that you possess that demonstrates your ability to perform the work of a Lead Construction Control Representative at the GS-13 grade level or equivalent pay band in the Federal Service.
(limit characters)
Select the one statement that most accurately describes your training and experience carrying out each task using the scale provided. (limit characters)
2. Perform reviews of plans and specifications of projects to ensure problems during construction are identified and corrected prior to completion.
(limit characters)
3. Participate in three phase inspection system by attending preparatory, initial and follow up inspections to ensure compliance of contract documents and the applicable safety manual.
(limit characters)
4. Apply knowledge of construction practices, codes, and standards to manage construction projects from their inception to completion. (limit characters)
5. Conduct job site inspections to ensure project is in compliance with the contract plans, specifications, shop drawings, special references and industry standards.
(limit characters)
6. Inspect worksite and work activity for construction practices that compromise the safety of laborers, inspectors, visitors and/or the general public to stop any construction activity that poses an imminent danger to life and limb and enforce correction of deficient safety program.
(limit characters)
7. Enforce site specific requirements such as safety when working near or around the general public, and dust and noise control, minimum impact to operation in the case of renovations to active facilities and sound environmental practices for all projects through observation the work and work methods of the contractor to ensure compliance. (limit characters)
8. Review contractor's proposed work schedules for logic, adequacy, and feasibility, identify and track changes on the critical path understanding the cause of the change and working  with stakeholders and construction schedules to minimize time and cost impacts associated with contractor error, changes and unforeseen conditions. (limit characters)
9. Enter and maintain all information pertaining to Quality Assurance (QA)/Quality Control (QC) reporting, to include safety inspections, pay requests, submittals, requests for information, scheduling, deficiency reporting and correction and correspondence for assigned projects for the purpose of tracking and documenting construction progress and/or deficiencies.
(limit characters)
10. Identify technical conflicts, deficiencies and omissions of contracting documents utilizing sound and effective construction practices to ensure efficient execution of the construction project.
(limit characters)
11. Manage construction at all stages to identify obstacles to contract completion to ensure delivery of technically sound projects on time and within budget.
(limit characters)
12. Monitor construction operations of construction projects to ensure technical compliance of plans and specifications.
(limit characters)
13. Manage construction schedules of complex structures to ensure project milestones are met and all delays are tracked and accounted.
(limit characters)
14. Draft correspondence to contractor addressing hazardous conditions, unsafe practices, and deficiencies at the construction site to ensure the contractor is in compliance with established safety standards and regulations.
(limit characters)
15. Communicate with co-workers, contractors, and customers to convey/relay information under stressful and time sensitive conditions to build and foster a good relationship between all parties. (limit characters)
16. Participate in meetings to discuss regular construction progress, change order proposals and settlement of claims in order to resolve disagreements with the stakeholders, special interest groups and/or contractors.
(limit characters)
17. Provide technical guidance to lower grade Construction Control Representatives to ensure the timely delivery of quality work products and services for assigned projects.
(limit characters)
18. Distribute workload and tasks among employees in accordance with established work flow, skill level and/or occupational specialization to ensure timely accomplishment of assigned team tasks.
(limit characters)
19. Review work developed by or modified by lower grade Construction Control Representatives to ensure work performed is of high quality and follows applicable regulations.
(limit characters)
20. Communicate team objectives, mission, goals, problems, milestones, techniques and work methods to ensure the timely delivery of quality work products and services for assigned projects.
(limit characters)
21. Your responses to the Announcement and Assessment Questionnaires, along with your resume and all supporting documentation are subject to evaluation and verification to ensure accuracy. Please take this opportunity to review your responses to ensure their accuracy.
(limit characters)